
PRODUCT
Home / Product
MIL-STD-810H Sand & Dust Test Chamber
CA$0.00
Dual-function sand and dust test chamber for MIL-STD-810H Method 510.7. It runs blowing sand (Procedure II) at high air velocity and, after the sand is removed and the circuit cleaned, blowing dust (Procedure I) at reduced fan speed – one machine for both procedures.
Standards
- MIL-STD-810H – Method 510.7, Procedure I blowing dust and Procedure II blowing sand
- IEC 60068-2-68 – dust and sand tests
- IEC 60529 / ISO 20653 (with IP configuration)
Technical data
| Functions | Dual: blowing sand (Proc. II) and blowing dust (Proc. I); sand removed and circuit cleaned before dust tests |
| Air circuit | Closed-loop stainless steel wind tunnel, variable-speed centrifugal fan, sand collection hopper under the test section (sand not re-circulated through the fan) |
| Air velocity | Adjustable, up to 29 m/s |
| Temperature | Heating system with temperature control for the high-temperature exposure |
| Humidity control | Dehumidifiers in the ducting and in the sand hopper (RH ≤ 30 % for dust tests, free-flowing sand) |
| Dust concentration | Measured in the test section with an optical particle-concentration meter |
| Proc. I – air velocity | 8.9 ± 1.3 m/s (1750 ± 250 ft/min); 1.5 ± 1 m/s during temperature conditioning |
| Proc. I – dust concentration | 10.6 ± 7 g/m³ (0.3 ± 0.2 g/ft³) |
| Proc. I – dust | 100 % < 150 µm, median 20 ± 5 µm (e.g. 140-mesh silica flour) |
| Proc. I – relative humidity | ≤ 30 % RH |
| Proc. I – duration | ≥ 6 h at standard ambient + ≥ 6 h at high temperature |
| Proc. II – air velocity | 18–29 m/s at impact (40–65 mph); about 3 m from injection to specimen |
| Proc. II – sand concentration | 2.2 ± 0.5 g/m³ near aircraft · 1.1 ± 0.3 g/m³ near surface vehicles · 0.18 (−0/+0.2) g/m³ natural conditions |
| Proc. II – sand | quartz sand ≥ 95 % SiO₂, 150–850 µm |
| Proc. II – duration | ≥ 90 min per vulnerable face |
| Specimen size | ≤ 50 % of cross-section, ≤ 30 % of volume |
| Control | PLC with touch HMI, fan speed setting, configurable test profiles, data logging, emergency stop |
| Construction | SS304 test section and ducting, abrasion-resistant air paths, viewing window, stainless steel base frame on levelling feet |
Ref.: ORTYDC810-MIL
Quantity
Test Principle & Function
MIL-STD-810H Method 510.7 has two procedures. Procedure I (blowing dust, particles < 150 µm) evaluates resistance to dust penetration into cracks, crevices, bearings and joints, and the effect on filters. Procedure II (blowing sand, 150–850 µm) evaluates erosion and clogging caused by sharp-edged particles driven at desert-wind speeds.
The chamber is a closed-loop wind tunnel: a variable-speed centrifugal fan drives air through the test section, where the specimen is exposed to a uniform, directional particle-laden air stream. For sand, the fan runs at high speed and the sand is collected in the hopper below the test section, so it is not re-circulated through the fan, as the standard requires. For dust, the sand is removed, the circuit is cleaned and the fan speed is reduced to the dust-test velocity, with the dust kept in suspension in the loop. One machine covers both procedures.
Why it matters: blowing dust reveals penetration into seals, bearings, connectors and filters; blowing sand reveals erosion of housings, lenses, coatings and radomes, and clogging of air paths. Both are required for materiel deployed in desert and unpaved-airfield environments.
Safety: silica flour and quartz sand can cause silicosis – the closed circuit keeps the test media contained; operators use respiratory protection when loading and cleaning.
Versions & Order Codes
Defense Series sizes
| DNDC810-MIL-S1 / ORTYDC810-MIL-S1 | 600 L – 1400 × 900 × 1800 mm – component level |
| DNDC810-MIL-S2 / ORTYDC810-MIL-S2 | 1000 L – 1700 × 1100 × 1900 mm – equipment level |
Ordering, Calibration & Warranty
- Lead time: up to 35 days with Ormity factory calibration; up to 60 days with an ISO/IEC 17025 calibration report (charged separately).
- Warranty: 1 year, plus lifetime warranty against non-compliance (excluding standard revisions published after the date of sale).
- Payment: international orders are 100% prepaid. All sales are final after 30 days.
- Shipping: by third-party international carriers; transit time depends on destination, packing (crate/pallet) and calibration route. Ask for a delivery estimate before ordering.






















