top of page
ormity-logo-1600px.png

A New Operator Interface for ORMITY Dust Chambers (IP5X / IP6X)

7 days ago
3 min read

A dust test lasts hours, sometimes a full working day, and most of what makes it valid happens while nobody is watching: the talc has to keep moving, the vacuum has to pull the right volume through the enclosure, and the chamber has to stay warm and dry. Our dust chambers now run on a new control system that takes care of all of this and shows the operator, at a glance, what the chamber is doing.

The hardware and the firmware are developed by ORMITY. They are the result of almost 20 years of building and servicing dust chambers, and of listening to the laboratories that use them every day.



One interface, two chamber sizes

The Titan Series uses a 10.1-inch touch screen; our compact chambers use a 5-inch one. Both share the same control core, the same safety logic and the same screens, laid out for each size. An operator trained on one chamber can run the other. Every screen is in English and French.


ORMITY compact dust chamber operator screen during an IP6X test
Compact series, 5-inch screen: test running

A self-check before anything heats up

At power-up the chamber calls each of its devices in turn: the recirculation pump, the vacuum pump, the door and safety inputs, the outputs, and the pressure, flow and temperature instruments. Each one turns green on screen when it answers. The heaters stay off until all of them are green. If one does not answer, the screen says which one and the chamber waits.

From login to report

  • Each operator logs in with a personal password; every test records who ran it.

  • The client name and the sample tag are entered before the test starts.

  • Recipes for IP5X, IP6X and development work hold the test duration, the vacuum settings and the settling time.

  • At the end, the test is written to a report and a data log (PDF and CSV) that can be printed on the laboratory printer.


New test screen with client, sample tag and IP5X IP6X recipe selection
New test: client, sample tag and recipe

The chamber in real time

The live view draws the chamber with its two circuits: the talc circuit in orange, from the collection funnel through the recirculation pump to the fan-shaped blowing in the upper corner, and the vacuum circuit in blue, from the sample through the pressure and flow sensors and the filter to the vacuum pump. Pump speeds, depression, flow, chamber temperature and extracted volumes update as the test runs. The door window shows the lamp and the talc cloud, so the operator can see what is happening inside without opening anything.


Dust chamber live view showing talc and vacuum circuits in real time
Live view: talc circuit in orange, vacuum circuit in blue

The IEC 60529 end criterion, applied automatically

For category 1 enclosures, IEC 60529 ends the test after at least 2 hours once 80 volumes of air have been drawn through the enclosure, or after 8 hours at most. The controller integrates the measured flow against the sample volume entered in the recipe and stops the test on that rule. The depression never exceeds the limit set for the enclosure, and a warning is recorded if the extraction rate falls too low.


IP6X test running screen with extracted volumes toward the 80-volume criterion
Test running: depression, flow, extraction rate and extracted volumes

Safety that does not depend on the operator

  • The door locks before the pumps start and stays locked during the settling time after the test. STOP ends the test; it never opens the door.

  • After a power cut, the door stays locked for the settling time before anything else happens, and the event is recorded.

  • If a device stops answering during a test, the pumps stop and the chamber goes to a safe state.

  • If extraction becomes too easy, a sign that the enclosure leaks and talc is reaching the vacuum filter, the test stops with a clear SAMPLE FAIL message, and vacuum tests stay blocked until the filter has been cleaned.


Sample fail screen asking the operator to clean the vacuum filter
Sample fail: extraction far too easy, clean the vacuum filter

Calibration and maintenance in view

Each instrument carries its calibration due date. A warning appears 30 days before it, and official recipes are refused once a calibration has expired. Pump hours, test counts and the breather filter service interval are counted by the chamber itself.

The new interface is being introduced on our Titan Series and compact dust chambers. For details or a demonstration, contact our team.

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.
bottom of page